Installation instructions
Instructions to be used for the installation of the weed control mats for the pilot projects of Life+
- Free surface totally from trees, plants and weeds
- Flatten surface
- Overlap 20cm. Take into account the dominant direction of the wind, when choosing the position of the overlap
- Fix the ends of the mat carefully wit U-shaped metal pins or dig the ends minimum 10 cm in the ground. Minimal sizes metal pin : 20 x 30 x20. Frequency : 1 every running meter in both length and with direction. So also the overlap and also the central parts of the rolls should be fixed - make cross incisions to allow planting plants or trees (better 3-star incision instead of 4-star)
- Close carefully the incision around the new installed plants or trees and cover that area with some gravel or bark
- After installation of the plants check carefully if all pins are still deep enough in the ground
Lay-out installation
- The pilot site should have a public access and should be clearly visible
- A panel given by DS should be installed (text to be discussed) on a clearly visible place
- The main quality Biocovers covers the main surface. Apart from this quality some other variants should be installed on a specific location
- This variants should be installed, all together, side by side, starting left with variant 1 – ending right with variant 8
- A specific location should be agreed where small samples can be taken away (to be discussed)