Pilot site BLACKBURN
Pilot site description:
The matting are used at Barbara Castle Way in Blackburn. The installation took place in March 2012, followed by planting in April. A mix of colorful plants has been used. The installation is not one big area, but a number of pieces throughout the arterial road. The road is called the A677 and runs down the side of Blackburn Town Centre.
Next to that, the matting has been used in rose beds on the Pleasington Cemetery and in flowerbeds in Corporation Park.
Panel, instructions, information,... concerning the pilot site Blackburn | |
Panel for the pilot site in Blackburn (english version) | Weed control - Panel pilot site Blackburn.doc (256 kB) |
Photo of the panel |
|
Installation instructions and lay-out | Weed control - installation instructions and lay-out.doc (947,5 kB) |
Flyer | Weed control - Flyer.pdf (2 MB) |
Pictures of the pilot site | |
November 2011 | Pictures before installation |
April 2012 | Pictures of the installation |
May 2012 | May 2012 - Pictures after the installation |
September 2012 | September 2012 - Pictures after the installation |
March 2013 | March 2013 - Pictures after the installation |
September 2013 | September 2013 - Pictures after the installation |
September 2014 | September 2014 - Pictures after the installation |